Snapshot Pruning - XIO+RP
Hello,
Is there a way we can calculate the snapshot pruning policy percentages, if the required protection window is changed? I ask, because I need to know how many snapshots will be roughly present for each period of time?
For clarity, if I change the required protection window to 5 days, what do the percentages look like? What are the different periods of time? I need to understand this so we can properly communicate the abilities of RP+XIO to application owners who will choose between different protection windows.
No Events found!
forshr
2 Intern
•
1.1K Posts
0
December 17th, 2015 09:00
If you change the protection window to 5 days then nothing will happen as the 5 day window sits within the threshold of the 5 - 30 day category. If you change it to 4 days you will automatically remove the snapshots for the 5 - 30 days category and the 5% allocation from the 5 - 30 day category will be assigned to the 0 - 2 hours percentage total, i.e. it will become 45% from 40%.
Regards,
Rich Forshaw
RecoverPoint Corporate Systems Engineering
Idan
675 Posts
1
December 16th, 2015 12:00
Hi there,
If the protection window is less than 30 days which is the default, the pruning mechanism will ignore irrelevant time windows and adjust the remaining time windows to make up 100%.
In your example, no time windows will be be ignored (5 days is a part of the "oldest" time window) so the calculation of the percentage in each time window will remain as in the table.
Hope that helps,
Idan Kentor
RecoverPoint Corporate Systems Engineering
Email: idan.kentor@emc.com
Twitter: @IdanKentor