Recoverpoint Scenario


Hi,

We are testing recoverpoint scenario.

1.  If WAN link is down,  Can we enable image access to recovery site image?  I presume once the link is back, a short resync might happen.

2.  If WAN link is down.  Can we still perform failover to the recovery site?  What is the process to recover the production?

3. Is there anyway to prevent sync back to Production site once the failover is happened?  I would like to discard the changes at recvoery site.

2 Intern

 • 

1.1K Posts

August 6th, 2014 03:00

Hi,

1) Yes. Correct.

2) Yes. Fail back.

3) No, but you could use DIrect Image Access at the Recovery Site rather than failover.

Regards,

Rich