Issue with failback


Hi

Does anyone have a procedure for test a copy and failover, failback for SQL clusters, hosts?

Also, when I fail back, do I unprovision the luns from the DR host?

So here is what I have so far:

Set up RP CGs for SQL host

Presented luns to DR host from DR array replicating before failover

Failover was successful, SQL started

More files created on DR host and luns, looked like it was copying the other way

Failed back

Unprovisioned luns from DR host

RP copying again from Prod-DR

DR files created not on Prod copy after failback

Thanks in advance,

Admingirl

2 Intern

 • 

1.1K Posts

March 29th, 2016 02:00

Hi there,

There is a procedure for managing the hosts as part of a recovery activity in the RP Admin Guide and don't forget that there are specific warnings as part of the process when you initiate these activities from the GUI.

Regards,

Rich Forshaw

Consultant Corporate Systems Engineer - RecoverPoint & VPLEX (EMEA)

Data Protection and Availability Solutions

EMC Europe Limited

Mobile: 44 (0) 7730 781169 44%20(0)%207730%20781169>

E-mail: richard.forshaw@emc.com

Twitter: @rw4shaw