Unsolved
This post is more than 5 years old
2 Intern
•
614 Posts
0
660
March 28th, 2016 09:00
Issue with failback
Hi
Does anyone have a procedure for test a copy and failover, failback for SQL clusters, hosts?
Also, when I fail back, do I unprovision the luns from the DR host?
So here is what I have so far:
Set up RP CGs for SQL host
Presented luns to DR host from DR array replicating before failover
Failover was successful, SQL started
More files created on DR host and luns, looked like it was copying the other way
Failed back
Unprovisioned luns from DR host
RP copying again from Prod-DR
DR files created not on Prod copy after failback
Thanks in advance,
Admingirl
No Events found!
forshr
2 Intern
•
1.1K Posts
0
March 29th, 2016 02:00
Hi there,
There is a procedure for managing the hosts as part of a recovery activity in the RP Admin Guide and don't forget that there are specific warnings as part of the process when you initiate these activities from the GUI.
Regards,
Rich Forshaw
Consultant Corporate Systems Engineer - RecoverPoint & VPLEX (EMEA)
Data Protection and Availability Solutions
EMC Europe Limited
Mobile: 44 (0) 7730 781169 44%20(0)%207730%20781169>
E-mail: richard.forshaw@emc.com
Twitter: @rw4shaw