Start a Conversation

Unsolved

A

1 Rookie

 • 

18 Posts

32

March 5th, 2025 11:42

adding new appliance into an existing cluster- PowerStore 500T

Hello all, when adding a new PS, it is not discovered. for my reference, I want to know how can i make sure that the Dell ToR (PowerSwitch S5224F-ON) required configuration is done properly. I want to know what sections to check in the show-tech (Cisco management switch) and support save file (Dell PowerSwitch) to make sure the required configuration is done properly.

 

what i understand that:

-All Nodes need to share the same access / native / untagged VLAN on the interfaces of bond0 
-the management ports of all Nodes as well need to share the same native VLAN

 

regarding the management 

interface mgmt1/1/1

 

description OOB_MGMT

 

no shutdown

 

no ip address dhcp

 

ip address xxxxx

 

ipv6 address autoconfig

and 

interface mgmt1/1/1

 

description OOB_MGMT

 

no shutdown

 

no ip address dhcp

 

ip address xxxxx

 

ipv6 address autoconfig

 

for iscsi:

 

Port-channel 50 is up, line protocol is up
Description: LACP port-channel for Node A - 2ND POWERSTORE 500T

 

Port-channel 60 is up, line protocol is up
Description: LACP port-channel for Node B - 2ND POWERSTORE 500T

No Responses!
No Events found!

Top