adding new appliance into an existing cluster- PowerStore 500T
Hello all, when adding a new PS, it is not discovered. for my reference, I want to know how can i make sure that the Dell ToR (PowerSwitch S5224F-ON) required configuration is done properly. I want to know what sections to check in the show-tech (Cisco management switch) and support save file (Dell PowerSwitch) to make sure the required configuration is done properly.
what i understand that:
-All Nodes need to share the same access / native / untagged VLAN on the interfaces of bond0
-the management ports of all Nodes as well need to share the same native VLAN
regarding the management
interface mgmt1/1/1
description OOB_MGMT
no shutdown
no ip address dhcp
ip address xxxxx
ipv6 address autoconfig
and
interface mgmt1/1/1
description OOB_MGMT
no shutdown
no ip address dhcp
ip address xxxxx
ipv6 address autoconfig
for iscsi:
Port-channel 50 is up, line protocol is up
Description: LACP port-channel for Node A - 2ND POWERSTORE 500T
Port-channel 60 is up, line protocol is up
Description: LACP port-channel for Node B - 2ND POWERSTORE 500T