Unsolved
This post is more than 5 years old
2 Intern
•
227 Posts
0
2088
January 21st, 2011 11:00
PowerPath does not pring the second path up after failover
Hello ,
i was trying to simulate a failover test on an AIX machine, i removed one cabel for few minutes, then replug it again , the server can not detect the second path till we ran powermt config. running powermt display shows the second path as "FAILED" till reconfig PP.The question is why do i need to run powermt config? it should be detected automatically without interaction ,right ? am running the latest PP version!
No Events found!