Shutdown array for shipment
I need to ship a 6210 to another office and the array will be off for several days. Is there anything special I need to do? Seems like I just need to hit the shutdown button in the management Java applet twice (I assume it shuts down the active controller and then the passive will take over so I need to shutdown again). After that I just flip the power switches on the power supplies and I'm good to go?
When the array gets to its destination, plug in power and flip the power switch and array will power on?
I always see a note in the release notes about standby mode and not coming out of standby but that's not an issue here because I'm not turning on that option, right? This is just a clean shutdown and power back on.