We've downloaded the configuration guide, but it doesn't make this step clear:

To set the initial mgmt interface,which appears to be eth2, does this require a serial connection only or can it be done via network?

Also, the link to the administrator's guide in the configuration guide does not work, is there another resource for this?

Thanks.

3 Posts

December 6th, 2016 08:00

OK, thanks but this actually is a bit more confusing. Is there a good link to the docs for initial setup?

4 Operator

 • 

2.3K Posts

December 6th, 2016 08:00

The mgmt is optional in EQL land and you configure it as a last step which is may confusing compared to other systems.

After the initial setup which use the eth0[1?] port or the serial you can use ssh, gui or serial to configure the MGMT WKA together with eth2.