Start a Conversation

Unsolved

T

4 Posts

868

July 13th, 2021 05:00

DPA & Networker active job riport problem

Hi!

I have problem with the job summary report. I always get unrealistically high number of active jobs. I found that some jobs (mostly 1-2 sec duration, job type: RMAN) listed in 'Backup succesful jobs report' and 'Backup active jobs report' too (same job id). If we check at backup software level the state of these jobs are ok.

Has anyone faced this issue?

-----------------------------------------
DPA version is 19.3.0 (patch 7)
Networker version: Networker 19.2.0.1 Build 117

 

Thanks!

 

No Responses!
No Events found!

Top