Compellent - remove un-connected paths
Hi Team,
Situation:
- Server with 04 FC ports.
- Storage SC4020 (dual controller 16Gb FC type): FE in Virtual port mode
- 2 pcs of switch Brocade 65xx: No zone.
So inside the DSM, server has 16 paths to Volume.
After create zone on Brocade switch (follow Deployment guide), the server only has 8 paths (HBA to Storage FEs' virtual WWN), other 8 paths (HBA to Storage FEs' physical WWN) are disconnected. And inside DSM, it shows "Partial connect". Here is some from CLI as the attached file.
Pls advise how to remove the 8 disconnected paths.
No Events found!
DELL-Bob Mi
2 Intern
•
230 Posts
0
February 21st, 2018 09:00
Anytime the zoning is changed the proper way to get the Storage Center to remove disconnected paths is to perform a rolling reboot of the system. By rebooting each controller in order the connections are re-evaluated by the system. Do not rebalance the local ports after each controller reboot.